Concrete slabs & footings
A slab is only as good as the ground and steel underneath it. We prepare the site, set out the footings and reinforcement and pour to your engineer’s specification, so it’s ready for the build on top.

A footing transfers the load of a wall or column into the ground. A slab is the floor. In most residential work the two are combined — a raft or stiffened slab has thickened beams around the edges and under load-bearing lines, so the floor and the footings are poured as one piece.
The complete package
The sequence is the same whether it is a carport or a house. What changes is the engineering, and how much of the site has to be rebuilt before it can start.
Working from your engineer or builder’s plans. Dimensions, levels and beam positions marked and checked before anything is dug.
Site stripped, beams and footings dug, and a compacted base laid. On sloping or filled sites this is most of the job.
Edge beams, internal beams and pad footings excavated to the depth and width the engineering calls for, not to whatever the ground makes easy.
Vapour barrier laid and taped where specified, and plumbing, drainage and electrical penetrations set in position before steel goes down.
Mesh, trench mesh and bar placed to the drawings, on chairs at the specified cover. Cover is the thing that decides whether steel lasts.
Placed, screeded, finished to the required surface and cured. Levels checked before the crew leaves, because a builder will find every millimetre.
Types
Shed slabs have their own page — they are our biggest slab category and a different buying decision. Everything else sits here.
Full raft slabs to engineering for secondary dwellings, including the service set-outs. A steady category across both the Hills and the Hawkesbury.
Vehicle-rated slabs with the falls, edge details and thresholds worked out so water runs out rather than in.
Tying a new slab to an existing building — the fussiest residential slab work there is, with levels, damp and existing footings all to manage.
Footings for walls, posts, columns and piers where the structure does not sit on a slab at all.
Our largest slab category, covered in full on the shed slabs page — garden sheds through to machinery sheds.
Our standard
On engineered work we build to your drawings. Where there are no drawings — a carport slab, a small extension — this is our own standard, and it is on the quote.
| Design basis | Sites classified under AS 2870, which sets the deemed-to-satisfy footing designs for Class 1 dwellings and Class 10a outbuildings across seven site classes. Where an engineer has issued drawings, we build to those. |
|---|---|
| Inspections | We work in with your certifier or engineer for pre-pour inspection and hold points. Nothing gets poured over unapproved steel. |
Pricing
Two slabs of identical area on neighbouring blocks can differ substantially in price, and almost all of it comes from the ground rather than the concrete.
The technical bit
If you understand one thing about slab pricing before you collect quotes, make it this.
AS 2870, the Australian Standard for residential slabs and footings, covers Class 1 dwellings and Class 10a outbuildings such as garages, carports and sheds. It classifies a site into one of seven classes — A, S, M, H1, H2, E or P — based on how much the soil moves as its moisture content changes.
Class A is stable sand or rock. Class P is a problem site requiring custom engineering. Reactive clay sites in the middle of that range need deeper edge beams, more steel and a heavier slab than a stable site does.
This is why a slab quote without a site classification behind it is a guess. It is also why two quotes for the same building can differ by thousands without either being dishonest — they may be pricing different slabs.
Source: AS 2870:2011 Residential slabs and footings, Standards Australia (site classification, Section 2; outbuildings, Clause 1.8). Checked 15 September 2026.
For straightforward sites, AS 2870 provides deemed-to-satisfy designs that can be used without a bespoke structural design. Highly reactive and problem sites fall outside those tables and require a structural engineer working directly to the standard.
The standard also notes that residential footing design and construction complies with AS 3600 for concrete, except where AS 2870 takes precedence.
If your job needs an engineer, we will tell you at the quote. We would rather lose a week to a proper design than pour a slab that moves.
Sources: AS 2870:2011 Residential slabs and footings; AS 3600 Concrete structures. Checked 15 September 2026.
Recent work




Why Southo
Excavation, base and slab under one contractor. No handover point for a problem to hide in.
Beam depths, cover and reinforcement as specified, not as convenient. Pre-pour inspections respected.
If the site needs an engineer, more excavation or retaining first, we say so at the quote rather than as a variation.
Services, penetrations and bolt positions in place beforehand, not cut in afterwards.
Used to working to a builder’s program and a certifier’s hold points. Commercial and civil work is on the commercial page.
Licensed NSW concreting contractor with public liability and home warranty insurance. Details supplied on request.
Send through the plans and engineering and we’ll come and look at the site.
Reviews
Service area
Based in the Hawkesbury, working across the Hills, Sydney and the Central Coast.
Questions
For a straightforward site, AS 2870 provides standard designs that can be used without a bespoke structural design. Highly reactive and problem sites fall outside those tables and need an engineer. If your site is one of them we will tell you at the quote.
It comes from a geotechnical investigation, usually arranged as part of the building process. If you do not have one and the job needs one, we will point you to it — it is not something to guess at.
Yes, and a good share of our slab work is exactly that. We work to your engineer’s drawings and coordinate with your certifier’s inspections.
We set out and accommodate penetrations and conduits as part of the slab, working in with your plumber and electrician. The plumbing itself is their trade and has to be signed off before we pour.
Where specified, the membrane is laid and taped before the steel. It is a standard requirement on habitable slabs and it is not somewhere to economise.
It varies with the slab, the weather and the engineering. We give you the date on the day of the pour rather than a rule of thumb.
Yes. It is fussier than a fresh slab — levels, damp management and the existing footings all have to be worked around — but it is common work for us on extensions.
Accuracy note
Planning and engineering information on this page is general and was correct at the date checked against the sources named above. Rules change and every site is different — confirm your own situation with Hawkesbury City Council, The Hills Shire Council or a registered certifier. Spotted something out of date? Email southoconcrete2@outlook.com.